NorTen was contacted by JCL Investments regarding the newly installed sanitary and storm system which was installed at the CBACH facility. Post-installation inspection was required to complete their contract with the general contractor. 

CB Hospital.jpg

PROJECT OVERVIEW

SUMMARY

Our crew met onsite with representatives from JCL in order to get a clear idea on what would be required for this particular portion of the project. JCL provided our team with design and as-built drawings of both systems and we began working for them immediately. Using our CCTV inspection equipment, we located the manholes which would be used and performed confined space entry to advance our equipment. Our equipment provided a High Definition video of the entire system detailing joint construction and pipe integrity as well as grade. Our added specialty locator was also used to give depth to the pipe invert. All recorded videos, photos of the project location and a detailed aerial diagram was provided to JCL immediately after project completion.

LOCATION

CORNER BROOK, NL, CANADA

YEAR

2023

CLIENT

JCL Investments Inc.

IMG_4559.HEIC
Manhole.jpg
bottom of page